Heat recovery at mine scale: three shafts, twelve compressors and a bathhouse

Mines are one of the best heat-recovery sites in industry, and for a reason that has nothing to do with compressed air: a mine has a large, constant, year-round hot water demand. Showers for the workforce run every day of the year regardless of season, and the alternative is usually coal or gas.

A project that started construction in November 2022 at a coal mine in Shanxi shows the scale that becomes possible when the two are combined. It covered three parts across two ventilation shafts, and the numbers below are the project’s forward estimates, not measured results.

The scope

At the first shaft: three compressors already in service were to be replaced and rebuilt as complete systems — cooling, discharge, control and power supply all re-optimised. Four compressors at the same shaft were then to have heat-recovery systems fitted, sized to provide hot water for a bathhouse serving 500 people.

At the second shaft: nine compressors in service were to be replaced and rebuilt on the same basis.

The whole installation was to be monitored from a central station — real-time data across rooms, with the intention of running unattended.

The estimates

| Scope | Estimated one-off investment avoided | Estimated coal equivalent saved per year | Estimated annual energy benefit |

|—|—|—|—|

| First shaft, 3 units rebuilt | over RMB 3 million | 486 t | over RMB 1.0 million |

| First shaft, 4 units with recovery | over RMB 2 million | 510 t | over RMB 0.7 million |

| Second shaft, 9 units rebuilt | over RMB 6 million | 723.2 t | over RMB 1.7 million |

| Total | over RMB 11 million | 1,719.2 t | over RMB 3.4 million |

Three things are worth separating in that table:

  1. The “investment avoided” column is not a saving from efficiency. It reflects the capital the mine would otherwise have spent on replacement plant, because the project replaced machines that were going to be replaced anyway. It is a legitimate project-economics argument and a poor energy argument, and the two should not be added together in a report.
  2. The coal equivalent is the honest energy unit for a site that would otherwise burn coal for hot water. It converts a compressed-air benefit into a fuel benefit, which is what the mine’s accounts actually see.
  3. Every figure is an estimate. Construction had just started when the project was announced. Estimates of this kind are typically optimistic on both the heat available and the hours the bathhouse runs.

What makes a mine a good recovery site

Four characteristics, and a plant can check itself against them:

  • Continuous compressor duty. Mine air systems run essentially all the time, so recoverable heat is available when the demand appears.
  • A large, temperature-insensitive hot-water load. Showers need the same water in July as in January, which removes the seasonal mismatch that kills recovery projects at factories.
  • An expensive alternative fuel. Replacing coal-fired or gas-fired hot water is a direct, priced saving.
  • Space and pipe routes that already exist. Mine surface buildings are often generous, and the compressor house is usually near the bathhouse.

The design questions that decide the outcome

  • How much heat is really recoverable per machine? At part load, recovery is proportionally lower. Twelve compressors that each spend half their time unloaded do not deliver twelve machines’ worth of hot water.
  • What happens in summer, when the bathhouse load is lowest and the compressors are hottest? Recovery capacity has to be able to back off without letting oil temperatures fall out of range.
  • Is there a buffer? Bathhouse demand peaks in the morning and evening shift changes; compressor heat arrives flat. A storage tank is usually the difference between a system that works and one that produces lukewarm water at the wrong time.
  • What protects the compressors? Recovery is placed upstream of the oil cooler. The thermostatic control that protects oil temperature must not be overridden to chase hot water.

Why the rebuild came first

The project rebuilt the compressors before adding recovery. That order is not accidental: a recovery system retrofitted onto a machine that is about to be replaced is wasted work, and rebuilding the cooling and control systems first means the recovery loop is designed against known oil temperatures and known running hours rather than the behaviour of an ageing machine.

For a plant planning both, this is the sequence to copy: fix the machines and their controls, measure a season of operation, then size recovery against the measurement.

—

Industry practice note. Figures are the project’s forward estimates as reported at construction start; the site described is not a SIND project.

Planning a compressed-air upgrade? Talk to SIND’s engineers.

Facts as reported by industry press; the project described is not a SIND project.

Planning a compressed air project?

Talk to an engineer
SIND Applications Engineering

The SIND applications engineering team reviews compressed air duty points, sizes systems and writes the technical articles published on this site.