GB/T 16665 is being rewritten: what changes for how you monitor air-system energy
The national standard for energy-saving monitoring of compressor units and air supply systems — GB/T 16665 — entered revision on 23 April 2024 at a kick-off meeting in Hefei, convened by the energy management standardisation committee (TC20) and hosted by a general-machinery testing institute. Around thirty experts from research institutes, design institutes and manufacturers took part.
For plant engineers, the interesting part is not the timetable. It is what a revision of a monitoring standard changes: the rules for how a saving is measured, and therefore what a plant can legitimately claim.
Why monitoring standards matter more than they look
An energy performance figure is only as good as the boundary it was measured across. Two plants can both report “35% saved” and mean completely different things:
- Saved against what baseline, measured over what period?
- At the compressor, or at the station outlet, or at the point of use?
- Corrected for ambient conditions, load profile and pressure level?
- With which instruments, at what accuracy, logged how often?
A monitoring standard exists to remove those choices. When it is revised, the definitions that retrofit contracts, certification applications and internal energy reports rely on are revised with it.
What is in scope
GB/T 16665 covers monitoring of both the compressor unit and the air supply system — the machine and the network that delivers its output. That scope is what makes it useful: it ties the machine’s specific power to the system’s losses instead of treating them as separate subjects.
The revision is being drafted jointly by a national standards research institute and the testing institute, and — this is the point worth noting — it is being aligned technically with the separate national standard on compressed air station energy performance evaluation. In practice that means the machine-level and station-level measurement methods are being written to fit together rather than independently.
The stated aims are conventional but substantive: support low-carbon technology in compressor and supply systems, push the system towards digital and intelligent operation, and provide a basis for energy-saving monitoring of equipment in service and for efficiency evaluation of new, modified and existing stations.
What plants should do now
Standards revisions are slow, and nothing changes on site the day a kick-off meeting is held. But the preparation that a revised monitoring standard will expect is the same preparation that pays back immediately:
- Fix the boundary. Decide, in writing, where the station starts and ends, and which meters belong to which boundary. Most disputes about savings come from this being left implicit.
- Meter the station, not just the machines. A kWh meter on each compressor does not capture dryer, filter and pressure-loss costs. Station-level electrical measurement is the number the evaluation standard will be built around.
- Log continuously and keep the data. Monthly readings cannot separate a load change from a control change. Hourly data over a full year — including a summer — is what any evaluation requires.
- Record the baseline’s operating conditions. Pressure level, ambient temperature and production volume at the time of measurement. A saving that is not corrected for these is a coincidence.
- Calibrate and document the instruments. Accuracy class, calibration date and installation point. An uncalibrated flow meter is a source of confident wrong numbers.
The direction of travel
Both standards point the same way: from single-machine efficiency towards system performance, measured at a defined boundary, over a defined period, with defined instrumentation. That shift favours plants that already have station-level metering and a year of data, and disadvantages plants that will have to reconstruct a baseline after the retrofit is finished.
If a station retrofit is planned for the next two years, the cheapest thing to do this quarter is install the meters and start logging. Whatever the final text of the revised standard says, that data will be admissible under it.
—
Industry standards note. Meeting details as reported by industry press; SIND is not involved in the drafting committee.
Planning a compressed-air upgrade? Talk to SIND’s engineers.
Facts as reported by industry press; the project described is not a SIND project.
Planning a compressed air project?
Talk to an engineerPublished November 16, 2026.